Cutter Drum Chemical Flush

Cutter drum arrived onsite unloaded and inspected. Visually inspected entry and exit points and fittings. Drained Vanes by removing pressure plugs Internal borescope inspection carried out. Connected required fittings & hoses and began clean water process (pumping clean water through cutter drum circuits) Check for leaks, contain & repair. Apply chemical and begin flushing process. […]
Chemical Descaling & Reconditioning TTT Cooler

Job Steps: Inspect TTT coolers and job evaluation Source correct fittings for job completion Pre-Flush borescope inspection imagin Flow Test pre-flushed coolers Pre-clean flushing to remove loose debris Chemical introduction for descaling corrosion Post clean borescope inspection imaging Coolers filled for transport with storage fluid Job Evaluations: Pre-flush flow rate evaluation Cooler 25mm Port – […]